ANKARA SUBWAY | ANKARA (ÇAYYOLU-KIZILAY)

In 2015, the construction of Ankara Kızılay-Çayyolu and Batıkent-Sincan subways, which was constructed by Açılım and Comsa companies, was completed. The Kızılay-Batıkent line of Ankara metro, which consists of 14,661 mt of line length and 12 stations, has a capacity of carrying 70,000 passengers per hour in one direction. TACER METAL SUSPENDED CEILING products of different types and models are used in the stations providing solutions for the flexible volume requirements of the stations and at the same time complete the visual integrity.

Info

Location
ANKARA (ÇAYYOLU-KIZILAY)
End date
2015
Contractor
COMSA- AÇILIM CONSTRUCTION
Architect